Stover Development Plans and Consultation

Future plans for Stover School - Have your say

Introduction

Stover School has strong ambitions and an overarching strategic aim of securing the long-term future for Stover School as a vibrant, thriving institution, able to fulfil its educational mission, and to meet its responsibilities as a custodian of Stover House and Park. Supporting this aim are four high-level objectives:

1. ‘To provide a class leading educational experience serving the needs of Devon’

2. ‘Be exemplary custodians of our historic estate’

3. ‘To promote and pursue environmental sustainability through education and across our estate and supply chain’

4. ‘To be a highly valued partner to the local community’

DOWNLOAD INFORMATION PACK HERE.

PLEASE COMPLETE THE QUESTIONNAIRE HERE

Everyone is invited to two consultation evenings at Stover School, in the Library, on October 3rd and 5th 2023 from 4:30pm to 6:45pm to see the proposed plans and to speak the design team and school staff.

A prosperous future for Stover School

The school’s mission is to nurture, celebrate and inspire each of its pupils through investing in educational excellence, and using a wholistic approach combining a progressive research base curriculum with a resilient moral code. They seek to encourage enthusiasm for learning and to enable each pupil to achieve their potential, to be confident and independent.

Stover School currently has an intake of approximately 500 pupils for 2022. This has grown in the past seven years, from an intake of 278 in 2014, due to the efforts of the new Head, the backing of the Board of Governors, and a new, dynamic Senior Leadership team. It has grown particularly rapidly over the past two years exceeding expectations.

In order to accommodate the existing pupils and maintain class sizes below 24, which is a key tenet of its educational approach, the school has reordered its existing facilities to maximise teaching space. This has included reducing boarding accommodation by two thirds to expand classroom space.

The available space is now fully used, coupled with the fact that some facilities such as science labs cannot be simply expanded into freed up spaces, there is no additional capacity to accept new pupils although the demand continues to rise. To temporarily relieve this pressure Stover School has introduced one additional modular classroom to the site.

The Need for Change

The School’s holistic long-term vision, has been shaped by:

  • A need to replace existing poorly performing temporary buildings, some of which are now 70 years old.
  • An in-depth review of its remaining building stock, seeking to maximise its efficiency.
  • A need to create much needed high-quality replacement and increased teaching space.
  • A need for a multi-use sports hall to replace a poorly performing existing temporary court cover, with the potential to be shared with the local community. 
  • Careful consideration of how any new elements can be consolidated and brought together in a way that respects and enhances the character of the historic landscape.

Masterplan: Existing

They have a stated aim to value the school’s special, natural environment and holistic estate and to use them wherever appropriate in the curriculum (see more on Stover Schools ethos here https://www.stover.co.uk/our-school/our-ethos/).

Engagement to date

  • Pre application engagement with Planning and Conservation Officers at Teignbridge District Council since 2021;
  • Continued engagement with Historic England and Stover Country Park since 2021;
  • Design Review Panel event completed in spring 2023 with Design West and an expert panel of built environment professionals.
  • Ongoing engagement with Sport England

The Site

Stover School occupies a small, but central part of Grade II Listed Stover Park and includes the Grade II* Listed buildings Stover House; the Former Stables; and the Clock House as well as the Grade II Listed Summer House and Terrace Walls and Grade II Higher Lodge. In addition to the historic buildings, the school includes a group of modern structures in a variety of styles and several temporary cabins. The site also includes car parking, tennis courts and a covered tennis court. These facilities lie to the west of the main drive into the school. An area of open sports fields and a small golf course lie to the east of the drive.

The school grounds are bounded to the south-west by the A382, to the north and north-east by parkland, to the south-east by an area of clay quarrying and to the south by the hedged boundary of privately owned Stover Park Farm.

Design Evolution

The design layout is the result of a rigorous landscape-led iterative options appraisal for the site, led by Westley Design Ltd and supported by AHMM Architects. This has been carefully honed through pre-application discussions with Teignbridge District Council and Historic England, and further reviewed by an expert Design Review Panel. The resulting masterplan vision aims to meet the current and future needs of the school, whilst enhancing the setting of Stover School within the wider Stover Park including, where possible, restoring or reinterpreting historic views and landscape.

Proposed Scheme

The Proposals

The design team, led by AHMM architects, have worked with Westley Design to develop a scheme to meet the challenging requirements of the site keeping in mind the historic importance of the listed buildings and wider parkland setting as well as the complex needs of the school itself. The proposals are made up of 3 phases:

Phase I: Sports Hall

  • A much-needed indoor sports facility which will supplement the current grass pitches and outdoor tennis courts.
  • The building can also double as a place to hold exams and as a venue for larger school events and assemblies.
  • The sports hall is also intended to be open during evenings and weekends for community use and will provide a range of sport marking as well as new changing facilities and a fitness suite which could be rented for small events or classes.
  • This building will be supported by a newly landscaped parking area and increased planting to the verges of Clockhouse Drive, thereby enhancing the historic setting of the Garde II* listed Clockhouse.

Phase II: Teaching Space

  • Replacement of existing poor quality teaching accommodation, currently housed in a series of aging temporary buildings, with two new purpose-built permanent buildings.
  • The new buildings will provide additional science laboratories and home economics facilities, as well as classrooms for languages, maths and humanities.

Additional works

  • Dining hall and kitchen refurbishments – Proposals include plans to refurbishment and enhance the existing dining hall and kitchens. This will result in an improved layout and a greater seating capacity.
  • Clockhouse Building – It is proposed to make a number of sympathetic alterations to this historic building, including the removal of a single storey modern addition to the front elevation and internal alterations to improve the functionality of this building.
  • Removal of the tennis court cover – This area currently serves as an indoor multi use space. However the cover has a temporary lifespan and planning permission, hence its proposed removal. The courts will however be retained and re-surfaced for future sporting use.
  • Car parking and access – It is proposed to improve access to the site for all users, whilst at all times prioritising the welfare of pupils. Vehicle parking will be improved to enable an improved user experience by all. It is also proposed to install a number of vehicle charging points.

Sustainability

All the proposals have been designed with sustainability at the forefront and will meet national standards, including user comfort, longevity of the building fabric, and energy use. Specific measures taken include:

  • Minimising new build through re-use and reinvention where possible
  • Applying passive design principles to building form and fabric
  • Utilising low energy equipment and tapping into the existing biomass boiler infrastructure on site
  • Selecting low carbon alternatives to building materials
  • Minimising the need to travel to off-site facilities
  • Providing infrastructure for EV charging and enhanced cycle parking

DOWNLOAD INFORMATION PACK HERE.

We welcome you to leave your feedback on our online questionnaire:

PLEASE COMPLETE THE QUESTIONNAIRE HERE